Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'Croton Road ' (1) ·
'CYPRESS WAY ' (1) ·
'Forest Hill Blvd. ' (1) ·
'NW 20TH ST WB ' (1) ·
'Shop Ctr Entrance ' (1) ·
'SR-80EB (Southern)' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'TROON DR ' (1)
704176 (1) ·
790164 (1) ·
790165 (1) ·
930408 (1) ·
930412 (1) ·
930416 (1) ·
934329 (1) ·
934421 (1) ·
935002 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935209 (1) ·
935210 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2 Mile S of Aurora Road' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10150 (1) ·
10410 (1) ·
1562 (1) ·
171592 (1) ·
1735 (1) ·
18041 (1) ·
185298 (1) ·
208200 (1) ·
57255 (1) ·
6940 (1) ·
69400 (1) ·
7636 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)