Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'Blue Lake Equalizer ' (1) ·
'CANAL C-108 ' (1) ·
'Gabordy's Canal ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Halifax River ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 (El Rio) Canal ' (1) ·
'Nav. Banana River Canal ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'Spruce Creek ' (1) ·
'Sweetwater Branch ' (1) ·
'TAYLOR CREEK ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CR603(JOHNSTON RD)' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'E. Minnesota Ave. ' (1) ·
'Girard Blvd. ' (1) ·
'Jackson Street ' (1) ·
'JORGENSEN RD ' (1) ·
'Magnolia Avenue ' (1) ·
'Minton Road CR-509' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'NW 20TH ST WB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'Riverside Drive ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-507 NB ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'Taylor Rd ' (1) ·
'Taylor Road ' (1) ·
'US-92 EB ' (1)
700185 (1) ·
704016 (1) ·
704075 (1) ·
790097 (1) ·
794009 (1) ·
794010 (1) ·
794014 (1) ·
794015 (1) ·
795713 (1) ·
796412 (1) ·
880060 (1) ·
930373 (1) ·
934224 (1) ·
934421 (1) ·
934905 (1) ·
934940 (1) ·
940029 (1) ·
940041 (1) ·
940071 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'.75 miles South of SR-882' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'US-92 EB -Tomoka River ' (1)
26221083 (1) ·
26240578 (1) ·
26295449 (1) ·
26383999 (1) ·
26433040 (1) ·
27201582 (1) ·
27201586 (1) ·
27201587 (1) ·
27275808 (1) ·
27281147 (1) ·
27281239 (1) ·
27385917 (1) ·
28004740 (1) ·
28004932 (1) ·
28233806 (1) ·
29001931 (1) ·
29020919 (1) ·
29050220 (1) ·
29062471 (1) ·
29081340 (1) ·
29095064 (1) ·
29123848 (1)
80032221 (1) ·
80043860 (1) ·
80054082 (1) ·
80075212 (1) ·
80120021 (1) ·
80194850 (1) ·
80213056 (1) ·
80215969 (1) ·
80222500 (1) ·
80232703 (1) ·
80251175 (1) ·
80371970 (1) ·
80401219 (1) ·
80401977 (1) ·
80513106 (1) ·
80544173 (1) ·
81002850 (1) ·
81010311 (1) ·
81012325 (1) ·
81035390 (1) ·
81052615 (1) ·
81160318 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)