Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'Blue Lake Equalizer ' (1) ·
'CANAL-1 ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Gabordy's Canal ' (1) ·
'Halifax Canal Lateral ' (1) ·
'LATERAL CANAL C ' (1) ·
'OUTFALL SLOUGH ' (1) ·
'RELIEF CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Sweetwater Branch ' (1) ·
'TAYLOR CREEK ' (1)
'4TH STREET ' (1) ·
'CR-619 82ND AVE. ' (1) ·
'CR603(JOHNSTON RD)' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'E. Minnesota Ave. ' (1) ·
'Jackson Street ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'Riverside Drive ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR91 SB TPK 189.1 ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'Taylor Rd ' (1) ·
'Taylor Road ' (1)
794009 (1) ·
794010 (1) ·
794014 (1) ·
795713 (1) ·
796412 (1) ·
880018 (1) ·
880019 (1) ·
880060 (1) ·
884022 (1) ·
940029 (1) ·
940041 (1) ·
940043 (1) ·
940071 (1) ·
940111 (1) ·
940112 (1)
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'0.7 MILE NORTH OF SR-60 ' (1) ·
'1.4 MI S OF OSCEOLA CNTY ' (1) ·
'100FT N OF ANGLE ROAD ' (1) ·
'1MI NORTH OF SR-60 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'AT 74TH AVE. ' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'I-95 over Midway Road ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)