Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'Blue Lake Equalizer ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'Gabordy's Canal ' (1) ·
'GARDEN CANAL ' (1) ·
'Halifax Canal Lateral ' (1) ·
'Halifax River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 (El Rio) Canal ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'Spruce Creek ' (1) ·
'Sweetwater Branch ' (1) ·
'Tomoka River ' (1)
'CAMINO GARDENS BL ' (1) ·
'CAMINO GARDENS BLV' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'CYPRESS WAY ' (1) ·
'E. Minnesota Ave. ' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'Jackson Street ' (1) ·
'Magnolia Avenue ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'NW 20TH ST WB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PALMETTO PK RD ' (1) ·
'Riverside Drive ' (1) ·
'SR-656 (17th St.) ' (1) ·
'Taylor Rd ' (1) ·
'Taylor Road ' (1) ·
'TROON DR ' (1) ·
'US-92 EB ' (1)
790097 (1) ·
794009 (1) ·
794010 (1) ·
794014 (1) ·
794015 (1) ·
795713 (1) ·
796000 (1) ·
796412 (1) ·
880077 (1) ·
890101 (1) ·
930329 (1) ·
934224 (1) ·
934421 (1) ·
934516 (1) ·
934902 (1) ·
935002 (1) ·
935204 (1) ·
935205 (1) ·
935206 (1) ·
935207 (1) ·
935209 (1) ·
935210 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.1MI E of SW 9TH AVE ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2 mi East of SR-421 ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'US-92 EB -Tomoka River ' (1)
26201757 (1) ·
26201913 (1) ·
26202088 (1) ·
26202500 (1) ·
26202775 (1) ·
26202815 (1) ·
26210226 (1) ·
26221083 (1) ·
26354653 (1) ·
26370804 (1) ·
26400360 (1) ·
26433040 (1) ·
27084791 (1) ·
27375640 (1) ·
29001931 (1) ·
29020919 (1) ·
29050220 (1) ·
29062471 (1) ·
29081340 (1) ·
29095064 (1) ·
29123848 (1) ·
29165358 (1)
80043860 (1) ·
80054082 (1) ·
80054881 (1) ·
80054885 (1) ·
80055270 (1) ·
80055282 (1) ·
80060114 (1) ·
80060914 (1) ·
80063334 (1) ·
80074511 (1) ·
80074852 (1) ·
80112778 (1) ·
80221680 (1) ·
80491520 (1) ·
80544173 (1) ·
81002850 (1) ·
81010311 (1) ·
81012325 (1) ·
81035390 (1) ·
81052615 (1) ·
81054109 (1) ·
81160318 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.