Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'C-37 Canal ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'E-2-W canal ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'FL. TURNPIKE ' (1) ·
'I-95 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E1 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'M CANAL ' (1) ·
'MOORES CREEK ' (1) ·
'Over D Canal ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'WILLOUGHBY CREEK ' (1)
'20TH AVENUE ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE NB ' (1) ·
'E Gateway Blvd ' (1) ·
'HAVERHILL ROAD ' (1) ·
'HOOD RD 110.944 ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'INDIAN STREET ' (1) ·
'Minton Rd. ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'Palm Bay Library ' (1) ·
'PURDY LANE ' (1) ·
'SR-3 ' (1) ·
'SUMMIT BLVD ' (1) ·
'Tangerine Drive ' (1) ·
'US-1 ' (1) ·
'YAMATO RD ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700007 (1) ·
700008 (1) ·
700072 (1) ·
704143 (1) ·
704256 (1) ·
884062 (1) ·
894040 (1) ·
930433 (1) ·
930438 (1) ·
930441 (1) ·
930448 (1) ·
930449 (1) ·
930800 (1) ·
934228 (1) ·
934256 (1) ·
934322 (1) ·
934332 (1) ·
934922 (1) ·
934923 (1) ·
934928 (1) ·
934945 (1) ·
934946 (1) ·
940020 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.3MI E of SR-7 (US-441) ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.7mi W Forrest/Tangerine' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'BOYNTON BCH EAST OF TPK ' (1) ·
'BOYNTON BCH WEST OF TPK ' (1) ·
'Minton Road-I-95 ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
26212592 (1) ·
26212629 (1) ·
26233914 (1) ·
26233917 (1) ·
26233970 (1) ·
26314057 (1) ·
26314182 (1) ·
26314200 (1) ·
26330220 (1) ·
26344632 (1) ·
26384113 (1) ·
26394749 (1) ·
26410304 (1) ·
26450216 (1) ·
26515528 (1) ·
27102110 (1) ·
27270481 (1) ·
27355685 (1) ·
27594683 (1) ·
28025656 (1) ·
28070512 (1) ·
28072700 (1) ·
28242777 (1)
80041485 (1) ·
80052259 (1) ·
80070375 (1) ·
80074101 (1) ·
80074389 (1) ·
80074430 (1) ·
80075210 (1) ·
80101583 (1) ·
80101586 (1) ·
80101941 (1) ·
80102313 (1) ·
80120025 (1) ·
80121064 (1) ·
80121067 (1) ·
80123610 (1) ·
80162939 (1) ·
80192498 (1) ·
80242120 (1) ·
80374336 (1) ·
80375049 (1) ·
80401656 (1) ·
80401795 (1) ·
80422154 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)