Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'CANAL L-12 ' (1) ·
'CR 708 ' (1) ·
'Cypress Creek ' (1) ·
'Drainage Canal ' (1) ·
'Header Canal ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'North Relief Canal ' (1) ·
'SB I-95 To EB 706 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'SR786 I95 I95 Ramps ' (1)
'CONGRESS AVE NB ' (1) ·
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-3 ' (1) ·
'SR-80 EB ' (1) ·
'SR-80 WB ' (1) ·
'SR786 WB to SB I95' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'WB 706 To SB I-95 ' (1) ·
'WB SR 70 ' (1)
700072 (1) ·
880004 (1) ·
880029 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890130 (1) ·
890131 (1) ·
930354 (1) ·
930355 (1) ·
930376 (1) ·
930381 (1) ·
930388 (1) ·
930419 (1) ·
934332 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934916 (1) ·
940119 (1)
'0.6Mi S OF CR-812 ' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'16Mi W of SR-7 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'2.5 miles North of SR-706' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'I 95 SR 706 interchange ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-3 SB over Barge Canal ' (1)
26210062 (1) ·
26210118 (1) ·
26252770 (1) ·
26252771 (1) ·
26344632 (1) ·
26433147 (1) ·
26433240 (1) ·
26502600 (1) ·
26525829 (1) ·
26525885 (1) ·
26555790 (1) ·
26581961 (1) ·
26582109 (1) ·
27023771 (1) ·
27023967 (1) ·
27033218 (1) ·
27033286 (1) ·
27222475 (1) ·
27413285 (1) ·
27413310 (1) ·
28242777 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)