Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'Canal ' (1) ·
'CR 709 & FECRR ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'MAPLE CREEK ' (1) ·
'North Relief Canal ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SR-507 ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1)
'21ST ST SW ' (1) ·
'CONGRESS AVE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'MAPP RD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'Pinehurst Ave N ' (1) ·
'PURDY LANE ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-3 ' (1) ·
'SR-507 ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'WB PGA Blvd. ' (1)
700007 (1) ·
700008 (1) ·
700072 (1) ·
700186 (1) ·
704045 (1) ·
880004 (1) ·
880029 (1) ·
884028 (1) ·
884039 (1) ·
884047 (1) ·
894033 (1) ·
930349 (1) ·
934322 (1) ·
934332 (1) ·
934491 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1) ·
940126 (1) ·
940127 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
26322160 (1) ·
26344632 (1) ·
26384113 (1) ·
26504098 (1) ·
27080035 (1) ·
27171853 (1) ·
27172347 (1) ·
27211679 (1) ·
27211974 (1) ·
27234232 (1) ·
27234592 (1) ·
27240492 (1) ·
27241193 (1) ·
27335447 (1) ·
27413285 (1) ·
27413310 (1) ·
27430923 (1) ·
27431016 (1) ·
28040738 (1) ·
28070512 (1) ·
28072700 (1) ·
28143333 (1) ·
28242777 (1)
80035722 (1) ·
80052259 (1) ·
80052654 (1) ·
80074389 (1) ·
80161820 (1) ·
80231981 (1) ·
80232174 (1) ·
80233923 (1) ·
80234014 (1) ·
80244777 (1) ·
80244820 (1) ·
80244973 (1) ·
80245174 (1) ·
80251481 (1) ·
80251602 (1) ·
80255073 (1) ·
80274275 (1) ·
80284193 (1) ·
80371675 (1) ·
80374336 (1) ·
80375049 (1) ·
80411355 (1) ·
80422154 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)