Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'BRANCH OF ICWW ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'Elbow Creek ' (1) ·
'EPB CANAL C-3 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Miller Creek ' (1) ·
'North Relief Canal ' (1) ·
'RANGE LINE CANAL ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Tributary to Spruce Crk ' (1)
'21ST ST SW ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'PURDY LANE ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR-3 ' (1) ·
'SW 18TH ST ' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1)
700007 (1) ·
700008 (1) ·
700072 (1) ·
794007 (1) ·
794008 (1) ·
794045 (1) ·
880004 (1) ·
880029 (1) ·
884028 (1) ·
884039 (1) ·
884047 (1) ·
930322 (1) ·
934125 (1) ·
934135 (1) ·
934322 (1) ·
934332 (1) ·
934487 (1) ·
935218 (1) ·
940111 (1) ·
940112 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'I-95 over Midway Road ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)