Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'C-24 CANAL ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'FIVE MILE CREEK ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'MANATEE POCKET ' (1) ·
'Miller Creek ' (1) ·
'Misner Branch ' (1) ·
'MOORES CREEK ' (1) ·
'North Relief Canal ' (1) ·
'RANGE LINE CANAL ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Tributary to Spruce Crk ' (1)
'21ST ST SW ' (1) ·
'CARLTON RD (CR613)' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'PALMETTO PK RD ' (1) ·
'PURDY LANE ' (1) ·
'SHINN ROAD ' (1) ·
'SR-3 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'Willowood Drive ' (1)
700007 (1) ·
700008 (1) ·
700072 (1) ·
704032 (1) ·
794007 (1) ·
794008 (1) ·
794045 (1) ·
796000 (1) ·
880004 (1) ·
880029 (1) ·
880077 (1) ·
884028 (1) ·
884039 (1) ·
884047 (1) ·
890101 (1) ·
930329 (1) ·
934322 (1) ·
934332 (1) ·
934516 (1) ·
934902 (1) ·
940018 (1) ·
940019 (1) ·
940020 (1) ·
940070 (1)
'.21 E of Minton Rd. ' (1) ·
'.7 mi S of Taylor Rd ' (1) ·
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'3MI S of SR-70 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
26210226 (1) ·
26344632 (1) ·
26370804 (1) ·
26384113 (1) ·
26400360 (1) ·
27084791 (1) ·
27201709 (1) ·
27201783 (1) ·
27243079 (1) ·
27270481 (1) ·
27335447 (1) ·
27375640 (1) ·
27413285 (1) ·
27413310 (1) ·
27430923 (1) ·
27431016 (1) ·
28030000 (1) ·
28070512 (1) ·
28072700 (1) ·
28242777 (1) ·
29032507 (1) ·
29042244 (1) ·
29055168 (1) ·
29165358 (1)
80052259 (1) ·
80074389 (1) ·
80074511 (1) ·
80074852 (1) ·
80112778 (1) ·
80192498 (1) ·
80212904 (1) ·
80221680 (1) ·
80244777 (1) ·
80244820 (1) ·
80255073 (1) ·
80274275 (1) ·
80282441 (1) ·
80284193 (1) ·
80324598 (1) ·
80374336 (1) ·
80375049 (1) ·
80400400 (1) ·
80422154 (1) ·
80491520 (1) ·
81040532 (1) ·
81040678 (1) ·
81040715 (1) ·
81054109 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)