Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'C-24 CANAL ' (1) ·
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FIVE MILE CREEK ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Miller Creek ' (1) ·
'North Relief Canal ' (1) ·
'RANGE LINE CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Tributary to Spruce Crk ' (1) ·
'Turkey Creek ' (1)
'CARLTON RD (CR613)' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'EB SR - 714 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'PURDY LANE ' (1) ·
'SHINN ROAD ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-3 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SW GREENRIDGE LANE' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-1 (SR-5) NB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'WB Lake Worth Rd. ' (1)
700072 (1) ·
704203 (1) ·
705910 (1) ·
794007 (1) ·
794008 (1) ·
880004 (1) ·
880029 (1) ·
884028 (1) ·
890134 (1) ·
894049 (1) ·
930319 (1) ·
930328 (1) ·
934221 (1) ·
934322 (1) ·
934332 (1) ·
937354 (1) ·
937360 (1) ·
940018 (1) ·
940019 (1) ·
940070 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1MI W OF CR-615 ' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2.1MI S of SR-70 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'3.75 Miles North of SR-60' (1) ·
'3MI S of SR-70 ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1) ·
'SR-3 SB over Barge Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)