Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'Big Tree Road ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'Dubber Road ' (1) ·
'HOLLY DRIVE ' (1) ·
'ISLAND DRIVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'ORANGE TREE DR ' (1) ·
'Quantum Blvd. ' (1) ·
'SR-80WB (Southern)' (1)
705601 (1) ·
794154 (1) ·
884055 (1) ·
884064 (1) ·
930407 (1) ·
934482 (1) ·
935001 (1) ·
935506 (1) ·
935507 (1) ·
936375 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1)
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-5A - Big Tree Rd ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)