Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'Crane Creek ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT 8 CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Seaboard Coastline RR ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1) ·
'Turnbull Creek ' (1) ·
'US-17/92 ' (1)
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'Boynton Bch Blvd ' (1) ·
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CONGRESS AVE SB ' (1) ·
'Dubber Road ' (1) ·
'French Avenue ' (1) ·
'GRANDVIEW WAY ' (1) ·
'HOLLY DRIVE ' (1) ·
'ISLAND DRIVE ' (1) ·
'KUDZA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'ORANGE TREE DR ' (1) ·
'Park Road ' (1) ·
'Pioneer Trail ' (1) ·
'Pioneer Trail ' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-472 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'WALLIS ROAD ' (1) ·
'WB SR-70 ' (1)
705601 (1) ·
790055 (1) ·
794006 (1) ·
794117 (1) ·
794118 (1) ·
884064 (1) ·
890110 (1) ·
890111 (1) ·
930237 (1) ·
930367 (1) ·
930801 (1) ·
934223 (1) ·
934312 (1) ·
934331 (1) ·
934920 (1) ·
934921 (1) ·
935001 (1) ·
935506 (1) ·
935507 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
937362 (1) ·
937366 (1) ·
940120 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.15 mi East of Bay Drive' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'2 miles West of US-17 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'SR-472 over US-17/92 ' (1)
26211596 (1) ·
26211635 (1) ·
26264610 (1) ·
26281369 (1) ·
26314090 (1) ·
26344631 (1) ·
26354425 (1) ·
26383900 (1) ·
26385460 (1) ·
26405332 (1) ·
26410344 (1) ·
26414262 (1) ·
26423785 (1) ·
26490539 (1) ·
26492346 (1) ·
26494723 (1) ·
27121953 (1) ·
27122261 (1) ·
27233900 (1) ·
27473810 (1) ·
28042875 (1) ·
28570842 (1) ·
28582691 (1) ·
29013457 (1) ·
29030188 (1)
80030866 (1) ·
80033398 (1) ·
80043826 (1) ·
80050391 (1) ·
80052320 (1) ·
80052354 (1) ·
80053044 (1) ·
80054787 (1) ·
80055088 (1) ·
80074249 (1) ·
80075828 (1) ·
80121056 (1) ·
80123486 (1) ·
80134460 (1) ·
80210453 (1) ·
80240091 (1) ·
80240291 (1) ·
80273077 (1) ·
80365044 (1) ·
80373635 (1) ·
80572813 (1) ·
81024737 (1) ·
81175636 (1) ·
81195603 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)