Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ALLAMANDA BLVD. ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Dubber Road ' (1) ·
'French Avenue ' (1) ·
'GLADES CUTOFF ' (1) ·
'HOLLY DRIVE ' (1) ·
'ISLAND DRIVE ' (1) ·
'JUPITER BEACH RD ' (1) ·
'KUDZA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'ORANGE TREE DR ' (1) ·
'Private Road ' (1) ·
'PROSPERITY FARMSRD' (1)
705601 (1) ·
794006 (1) ·
930237 (1) ·
930812 (1) ·
934125 (1) ·
934135 (1) ·
934312 (1) ·
935001 (1) ·
935506 (1) ·
935507 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
940069 (1)
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'2 miles West of US-17 ' (1) ·
'5.2MI S of CR-712 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)