Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'Crane Creek ' (1) ·
'Drainage Ditch ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'Hillsboro Canal ' (1) ·
'LWDD LAT 8 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Seaboard Coastline RR ' (1) ·
'US-17/92 ' (1)
'109TH STREET ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'Dubber Road ' (1) ·
'French Avenue ' (1) ·
'GLADES CUTOFF ' (1) ·
'HOLLY DRIVE ' (1) ·
'HORSESHOE POINT RD' (1) ·
'ISLAND DRIVE ' (1) ·
'KUDZA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'Main Trail ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'ORANGE TREE DR ' (1) ·
'Private Road ' (1) ·
'SR-472 ' (1) ·
'Willowood Drive ' (1)
704032 (1) ·
705601 (1) ·
790055 (1) ·
794006 (1) ·
796000 (1) ·
884064 (1) ·
890101 (1) ·
930812 (1) ·
934312 (1) ·
934516 (1) ·
935001 (1) ·
935506 (1) ·
935507 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
940069 (1)
'.21 E of Minton Rd. ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI S of FOREST HILL BV' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'2 miles West of US-17 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'5.2MI S of CR-712 ' (1) ·
'SR-472 over US-17/92 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)