Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'City St. & Crane Creek ' (1) ·
'CPB20 CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Dirksen Dr ' (1) ·
'Dirksen Drive ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'I-4 ' (1) ·
'Kellers Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'North Lake ' (1) ·
'Padgett Creek ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'RELIEF CANAL ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'St. Johns River ' (1) ·
'SWEETIE SLOUGH ' (1) ·
'Turkey Creek ' (1)
'EB SR - 714 ' (1) ·
'GOLDFINCH LANE ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PIONEER ROAD ' (1) ·
'Port Malabar Bl EB' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SEACREST BLVD. ' (1) ·
'SPARROW DRIVE ' (1) ·
'Spotted Fawn Way ' (1) ·
'SR-46 ' (1) ·
'SR-472 EB ' (1) ·
'SR802 (Lake Worth)' (1) ·
'SW GREENRIDGE LANE' (1) ·
'US-1 ' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB N. Lake Blvd. ' (1)
700006 (1) ·
704203 (1) ·
705910 (1) ·
790030 (1) ·
790042 (1) ·
790053 (1) ·
790099 (1) ·
790100 (1) ·
790941 (1) ·
890134 (1) ·
894049 (1) ·
930073 (1) ·
930195 (1) ·
930328 (1) ·
930335 (1) ·
930336 (1) ·
934221 (1) ·
934499 (1) ·
937354 (1) ·
937360 (1) ·
940101 (1) ·
940102 (1)
'.4mi. East of Congress ' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.6MI S of SW96 ST(CR76A)' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'1mi. West of US-1 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'At Lake Washington Rd ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'SR-46 - St. Johns River ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'US-1 - Crane Cr & City St' (1)
26322120 (1) ·
26370205 (1) ·
26370912 (1) ·
26401668 (1) ·
26415887 (1) ·
26421675 (1) ·
26482851 (1) ·
26502240 (1) ·
26502290 (1) ·
27044705 (1) ·
27101997 (1) ·
27245645 (1) ·
27245841 (1) ·
28010115 (1) ·
28043878 (1) ·
28085200 (1) ·
28425058 (1) ·
28520760 (1) ·
28520804 (1) ·
28521781 (1) ·
28521801 (1) ·
28571848 (1)
80035203 (1) ·
80040089 (1) ·
80050085 (1) ·
80060655 (1) ·
80060720 (1) ·
80074786 (1) ·
80120806 (1) ·
80131759 (1) ·
80140096 (1) ·
80161483 (1) ·
80183914 (1) ·
80231716 (1) ·
80231922 (1) ·
80354573 (1) ·
80360835 (1) ·
80424100 (1) ·
81020286 (1) ·
81152780 (1) ·
81170324 (1) ·
81170430 (1) ·
81170942 (1) ·
81171026 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)