Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
24387 (1) ·
58625 (1) ·
58725 (1) ·
Atlantis (1) ·
Boynton Beach (1) ·
Delray Beach (1) ·
Greenacres City (1) ·
Lake Worth (1) ·
New Smyrna Beach (1) ·
North Palm Beach village (1) ·
Palm Beach Gardens (1) ·
Palm Springs village (1) ·
Port Orange (1) ·
Royal Palm Beach village (1) ·
Vero Beach (1) ·
Wellington village (1)
'C-17 CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Canal - D ' (1) ·
'E-4 CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'HALF MILE LAKE ' (1) ·
'HOWARD CREEK ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'L-30 CANAL ' (1) ·
'L.W.D.D. #10 ' (1) ·
'L.W.D.D. #9 ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'SALERNO CREEK ' (1) ·
'Thompson River ' (1) ·
'West Palm Beach Canal ' (1)
'10TH AVE NORTH ' (1) ·
'27TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CLINT MOORE RD ' (1) ·
'DAVIS ROAD ' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'KELLER ROAD ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'Military Trail ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'PINE LAKE ROAD ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-44 ' (1) ·
'SR-A1A ' (1) ·
'US-98 (SR-80) ' (1) ·
'WESTMORELAND BLVD ' (1)
790148 (1) ·
790151 (1) ·
790152 (1) ·
885809 (1) ·
894001 (1) ·
894041 (1) ·
930402 (1) ·
930409 (1) ·
930410 (1) ·
934116 (1) ·
934138 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1) ·
934929 (1) ·
934936 (1) ·
934937 (1) ·
934942 (1) ·
936350 (1) ·
937201 (1) ·
937202 (1) ·
940067 (1) ·
945250 (1)
'0.2 MI W of I-95 ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.8 MILE N OF 10TH AVE N ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'4 miles west of SR 7 ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-A1A over Halifax River' (1)
26243117 (1) ·
26290244 (1) ·
26290245 (1) ·
26332602 (1) ·
26361307 (1) ·
26375277 (1) ·
26375694 (1) ·
26381073 (1) ·
26382390 (1) ·
26404695 (1) ·
26404846 (1) ·
26405713 (1) ·
26405778 (1) ·
26485165 (1) ·
26494457 (1) ·
27084441 (1) ·
27132091 (1) ·
27153115 (1) ·
27245404 (1) ·
27384786 (1) ·
29012564 (1) ·
29014444 (1) ·
29085374 (1)
80041919 (1) ·
80042484 (1) ·
80050618 (1) ·
80054760 (1) ·
80054780 (1) ·
80061936 (1) ·
80065069 (1) ·
80072101 (1) ·
80072169 (1) ·
80074621 (1) ·
80114936 (1) ·
80120775 (1) ·
80120925 (1) ·
80121251 (1) ·
80162552 (1) ·
80162947 (1) ·
80172570 (1) ·
80172828 (1) ·
80214936 (1) ·
80240703 (1) ·
80541414 (1) ·
80550332 (1) ·
80583172 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)