Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'E-1 CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'HALF MILE LAKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'SALERNO CREEK ' (1) ·
'Sebastian Canal East ' (1) ·
'Sebastian Canal West ' (1) ·
'SEBASTIAN RIVER PRONG ' (1) ·
'TEN MILE CREEK ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1)
'COUNTRY CLUB DRIVE' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'GORDY ROAD ' (1) ·
'Haverhill Rd ' (1) ·
'KIRBY LOOP ROAD ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PINE LAKE ROAD ' (1) ·
'PROSPERITY FARMS R' (1) ·
'Volco Road ' (1) ·
'Wilden Road ' (1)
704085 (1) ·
704086 (1) ·
794131 (1) ·
794133 (1) ·
880063 (1) ·
884019 (1) ·
884053 (1) ·
884054 (1) ·
894001 (1) ·
894041 (1) ·
934116 (1) ·
934295 (1) ·
934313 (1) ·
934908 (1) ·
934924 (1) ·
934927 (1) ·
940067 (1) ·
944010 (1)
'.15 mi W of Fleming Grant' (1) ·
'0.1 mi W of Fleming Grant' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.6MI EAST OF MCNEIL ROAD' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'0.8MI SOUTH OF SR-70 ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'3.6 Miles West Of US-1 ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)