Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'C-51 Canal ' (1) ·
'Donald Ross Road ' (1) ·
'Drainage Canal ' (1) ·
'E-1 CANAL ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-91 (Fla. Turnpike) ' (1) ·
'SR-91 Fl. Tpk ' (1)
'EB 706 To SB I-95 ' (1) ·
'EB SR-710 ' (1) ·
'Haverhill Rd ' (1) ·
'Hood Road ' (1) ·
'Indiantown Rd. ' (1) ·
'LAKERIDGE BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'S. VERDE TRAIL ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SR-710 ' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
930120 (1) ·
930121 (1) ·
930239 (1) ·
930371 (1) ·
930372 (1) ·
930374 (1) ·
930380 (1) ·
930382 (1) ·
930383 (1) ·
930384 (1) ·
930385 (1) ·
930386 (1) ·
930387 (1) ·
930390 (1) ·
930391 (1) ·
930394 (1) ·
930398 (1) ·
934295 (1) ·
934313 (1) ·
934903 (1) ·
934908 (1) ·
934924 (1) ·
934927 (1)
'.5 mi East of I-95 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'At S Military Trail ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'South of Ramp to SR 706 ' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
'Tpk. SR 706 Interchange ' (1) ·
'Tpk. / SR 706 Interchange' (1)
25564070 (1) ·
26205893 (1) ·
26210242 (1) ·
26212624 (1) ·
26235178 (1) ·
26360809 (1) ·
26403896 (1) ·
26500886 (1) ·
26515340 (1) ·
26521995 (1) ·
26525862 (1) ·
26525996 (1) ·
26554196 (1) ·
26554560 (1) ·
26554700 (1) ·
26554800 (1) ·
26560311 (1) ·
26560369 (1) ·
26560443 (1) ·
26560450 (1) ·
26560606 (1) ·
26561100 (1) ·
26561248 (1)
80043210 (1) ·
80070400 (1) ·
80071317 (1) ·
80074066 (1) ·
80074402 (1) ·
80074514 (1) ·
80083165 (1) ·
80085370 (1) ·
80085515 (1) ·
80085650 (1) ·
80085830 (1) ·
80085950 (1) ·
80090063 (1) ·
80090130 (1) ·
80090356 (1) ·
80090683 (1) ·
80091289 (1) ·
80112200 (1) ·
80112928 (1) ·
80120027 (1) ·
80121038 (1) ·
80144509 (1) ·
80901477 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)