Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'BESSEY CREEK ' (1) ·
'C-18 Canal ' (1) ·
'CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'Danforth Creek ' (1) ·
'Deep Creek ' (1) ·
'E-1 Canal ' (1) ·
'FEC Railroad ' (1) ·
'Halifax River IWW ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'PHIPP CANAL ' (1) ·
'Reed Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (STUART INT) ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'ST LUCIE CANAL ' (1)
'CR-707(Citrus Ave)' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'EB SR-710 ' (1) ·
'Lake Ashby Road ' (1) ·
'MURPHY RD ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-40 ' (1) ·
'SR-415 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 126.5' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 SB TPK 134.32' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
790033 (1) ·
790034 (1) ·
790035 (1) ·
790132 (1) ·
794146 (1) ·
796500 (1) ·
890066 (1) ·
890068 (1) ·
890082 (1) ·
890083 (1) ·
890085 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
930120 (1) ·
930239 (1) ·
930401 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937714 (1) ·
940047 (1) ·
940050 (1)
'0.4MI NW OF HIGH MEADOW ' (1) ·
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'US-441 and SR-76 ' (1)
26220386 (1) ·
26433224 (1) ·
26435320 (1) ·
26435409 (1) ·
26440062 (1) ·
26440066 (1) ·
26521995 (1) ·
26554196 (1) ·
26590720 (1) ·
27033219 (1) ·
27070362 (1) ·
27092801 (1) ·
27102072 (1) ·
27102733 (1) ·
27112563 (1) ·
27121998 (1) ·
27222822 (1) ·
27263922 (1) ·
28535974 (1) ·
28555594 (1) ·
28563087 (1) ·
28563417 (1) ·
29092052 (1) ·
29171420 (1)
80053153 (1) ·
80053241 (1) ·
80060815 (1) ·
80090356 (1) ·
80121129 (1) ·
80133989 (1) ·
80134000 (1) ·
80142789 (1) ·
80144509 (1) ·
80161373 (1) ·
80162980 (1) ·
80175123 (1) ·
80180781 (1) ·
80184796 (1) ·
80192646 (1) ·
80195431 (1) ·
80230229 (1) ·
80370127 (1) ·
81005885 (1) ·
81030614 (1) ·
81060951 (1) ·
81060965 (1) ·
81063625 (1) ·
81080270 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)