Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'CROOKED CREEK ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'L-12 Canal ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Sykes Creek ' (1) ·
'WARNER CREEK ' (1)
'CR-611 43RD AVE. ' (1) ·
'HAGEN RANCH ROAD ' (1) ·
'ISLAND WAY ' (1) ·
'Levee Road ' (1) ·
'LOCKS ROAD ' (1) ·
'LPGA Blvd ' (1) ·
'MARGINAL RD ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'MONET ROAD ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR-520 ' (1) ·
'SR-60 ' (1) ·
'ST LUCIE BLVD ' (1) ·
'TROPICALIA AVE. ' (1) ·
'WEST LAKE DRIVE ' (1)
700193 (1) ·
790171 (1) ·
880087 (1) ·
884056 (1) ·
894014 (1) ·
894044 (1) ·
894050 (1) ·
894052 (1) ·
930806 (1) ·
934214 (1) ·
934240 (1) ·
934950 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1) ·
936551 (1) ·
940142 (1)
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'250ft North of SR-60 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-520 - Sykes Creek ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)