Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CROOKED CREEK ' (1) ·
'Daytona Canal ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Indian River IWW ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'Tillman Canal ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'Ballough Street ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DUDA ROAD ' (1) ·
'Highbridge Road ' (1) ·
'MARGINAL RD ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'Minton Road CR-509' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'ST LUCIE BLVD ' (1) ·
'US-192 EB ' (1) ·
'WEST LAKE DRIVE ' (1)
700181 (1) ·
704075 (1) ·
794025 (1) ·
795000 (1) ·
890107 (1) ·
890120 (1) ·
894014 (1) ·
930373 (1) ·
934214 (1) ·
934502 (1) ·
934519 (1) ·
934905 (1) ·
934940 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1)
'.3 mi South of Mason Ave ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2MI E of SR-76 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'US-192 EB - Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)