Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'CROOKED CREEK ' (1) ·
'Daytona Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-12 Canal ' (1) ·
'L-19 Canal ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'Turnbull Creek ' (1)
'Ballough Street ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'DUDA ROAD ' (1) ·
'Highbridge Road ' (1) ·
'JUPITER BEACH RD ' (1) ·
'LE CHALET BLVD ' (1) ·
'Levee Road ' (1) ·
'LINTON BLVD. ' (1) ·
'MARGINAL RD ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'S. LAKE DRIVE ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'ST LUCIE BLVD ' (1) ·
'SW 18TH ST ' (1) ·
'US-1 NB ' (1) ·
'WEST LAKE DRIVE ' (1)
790086 (1) ·
794025 (1) ·
795000 (1) ·
894014 (1) ·
930322 (1) ·
930806 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934125 (1) ·
934135 (1) ·
934214 (1) ·
934487 (1) ·
934502 (1) ·
934519 (1) ·
935218 (1) ·
935303 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1) ·
940111 (1) ·
940112 (1)
'.3 mi South of Mason Ave ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4MI NE OF A1A ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'I-95 over Midway Road ' (1) ·
'US-1 NB - Turnbull Creek ' (1)
26194915 (1) ·
26262317 (1) ·
26290520 (1) ·
26291118 (1) ·
26331032 (1) ·
26342300 (1) ·
26354162 (1) ·
26375624 (1) ·
26382116 (1) ·
26384803 (1) ·
26401000 (1) ·
26401808 (1) ·
26413511 (1) ·
26455204 (1) ·
26524856 (1) ·
26561862 (1) ·
27091468 (1) ·
27222697 (1) ·
27222932 (1) ·
28491441 (1) ·
29133119 (1) ·
29243110 (1)
80035475 (1) ·
80042000 (1) ·
80043055 (1) ·
80043118 (1) ·
80043160 (1) ·
80043232 (1) ·
80044372 (1) ·
80054858 (1) ·
80075125 (1) ·
80104062 (1) ·
80120030 (1) ·
80243196 (1) ·
80243677 (1) ·
80295638 (1) ·
80381684 (1) ·
80391185 (1) ·
80423700 (1) ·
80423874 (1) ·
80482588 (1) ·
80513571 (1) ·
81012374 (1) ·
81060320 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)