Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Canal - D ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'E-4 CANAL ' (1) ·
'Halifax River ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'Thompson River ' (1) ·
'Tide Relief Canal ' (1)
790147 (1) ·
790148 (1) ·
790151 (1) ·
790152 (1) ·
796401 (1) ·
885809 (1) ·
930038 (1) ·
930091 (1) ·
930361 (1) ·
930402 (1) ·
930413 (1) ·
934138 (1) ·
934293 (1) ·
934318 (1) ·
934348 (1) ·
934929 (1) ·
934942 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.9MI S OF SR-802 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'4 miles west of SR 7 ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'CR 880 AT SIX MILE BEND ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-A1A over Halifax River' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)