Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
None (1) ·
54175 (1) ·
58725 (1) ·
Belle Glade (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Cocoa (1) ·
Daytona Beach (1) ·
Delray Beach (1) ·
Greenacres City (1) ·
Holly Hill (1) ·
Indiantown village (1) ·
Malabar (1) ·
New Smyrna Beach (1) ·
Ormond Beach (1) ·
Port Orange (1) ·
Riviera Beach (1) ·
Sewall's Point (1) ·
Titusville (1) ·
Vero Beach (1) ·
West Palm Beach (1)
'11th Street Canal ' (1) ·
'BARBARA BASIN ' (1) ·
'Berrys Canal ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'Conners Canal ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Drainage Canal ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'L-5 Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'M CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Misner Creek ' (1) ·
'NORTH CANAL ' (1) ·
'Nova Canal ' (1) ·
'Raulerson Canal ' (1) ·
'ROY'S SWALE ' (1) ·
'Sebastian Canal ' (1) ·
'SFC DIST CANAL NO 1 ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'ST LUCIE CANAL ' (1) ·
'ST. LUCIE RIVER ' (1) ·
'US-1 & FECRR ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WILLOUGHBY CREEK ' (1) ·
Banana River Relief (1)
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
10000 (1) ·
10200 (1) ·
120 (1) ·
1340 (1) ·
14168 (1) ·
14200 (1) ·
14600 (1) ·
16000 (1) ·
17500 (1) ·
18000 (1) ·
18300 (1) ·
190 (1) ·
19900 (1) ·
200 (1) ·
22000 (1) ·
2250 (1) ·
24000 (1) ·
24900 (1) ·
25500 (1) ·
26500 (1) ·
28140 (1) ·
29500 (1) ·
2993 (1) ·
3100 (1) ·
31000 (1) ·
3111 (1) ·
318 (1) ·
3200 (1) ·
32000 (1) ·
3500 (1) ·
3550 (1) ·
3600 (1) ·
400 (1) ·
46000 (1) ·
5000 (1) ·
550 (1) ·
6960 (1) ·
748 (1) ·
78500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Future 114:
Showing below up to 47 results in range #1 to #47.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch