Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'Canal C-46 ' (1) ·
'CANAL E-1 ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD L-7 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'Nova Canal ' (1) ·
'RIO MAR BAY ' (1) ·
Indian River ICW (1)
700183 (1) ·
700184 (1) ·
700188 (1) ·
705917 (1) ·
794154 (1) ·
885808 (1) ·
930029 (1) ·
930362 (1) ·
930407 (1) ·
934482 (1) ·
934489 (1) ·
934930 (1) ·
936261 (1) ·
936375 (1)
'.2mi East of US-27 ' (1) ·
'0.04MI S OF FOREST HILL ' (1) ·
'0.19Mi. E of Congress Ave' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'3 Miles West of SR-786 ' (1) ·
'AT SR-7 US-441 ' (1) ·
'CR-516 over I-95 ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-518 - Indian River Rel' (1) ·
'SR-5A - Big Tree Rd ' (1) ·
SR-518 over Indian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)