Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BOYNTON CANAL ' (1) ·
'Habitat Connectivity ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'I-4 EB ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'Loxahatchee Slough ' (1) ·
'Main Relief Canal ' (1) ·
'SR-91 N/S TPK ' (1) ·
'St. Johns River ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Turnbull Creek ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'27th Street ' (1) ·
'Atlantic Avenue ' (1) ·
'EB SR-710 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'Graves Ave ' (1) ·
'IBIS WAY ' (1) ·
'MERCER AVE ' (1) ·
'SR-40 EB ' (1) ·
'SR-44 EB ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 ' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'SR91 On/Off Rmp106' (1) ·
'US-1 SB ' (1) ·
'WB SR-710 ' (1) ·
'WB US 98 SR 80 ' (1)
700217 (1) ·
700219 (1) ·
700220 (1) ·
700221 (1) ·
790189 (1) ·
790195 (1) ·
790217 (1) ·
790218 (1) ·
884077 (1) ·
930064 (1) ·
930461 (1) ·
930524 (1) ·
930535 (1) ·
930536 (1) ·
930539 (1) ·
931010 (1) ·
931011 (1) ·
936801 (1) ·
937708 (1)
'0.1MI WEST OF A1A ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Graves Ave over I-4 ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-40EB - Habitat Connect' (1) ·
'SR-44 EB - I-4 ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-520 WB - Banana River ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'US-1 SB - Turnbull Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.