Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Built 027 :
1952 or
1984
& Channel 061:
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-73 ' (1) ·
'CANAL E-105 ' (1) ·
'CANAL E-114 ' (1) ·
'CANAL E-8 ' (1) ·
'CANAL E-84 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'RELIEF CANAL ' (1) ·
'Ten Mile Creek ' (1) ·
'TRIBUTARY OF MANATEE CRE' (1) ·
'Turnbull Creek ' (1)
'Atlantic Avenue ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-A1A (DIXIE HWY)' (1) ·
'DARWIN BLVD ' (1) ·
'GETTYSBURG DR ' (1) ·
'GRANDVIEW WAY ' (1) ·
'IBIS WAY ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PAAR DR ' (1) ·
'Pioneer Trail ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SW 22ND WAY ' (1) ·
'UNDALLO RD ' (1) ·
'WALLIS ROAD ' (1) ·
'WB SR-70 ' (1)
794117 (1) ·
890043 (1) ·
890110 (1) ·
890111 (1) ·
930064 (1) ·
930367 (1) ·
934223 (1) ·
934331 (1) ·
934920 (1) ·
934921 (1) ·
935306 (1) ·
935900 (1) ·
936801 (1) ·
937362 (1) ·
937366 (1) ·
940120 (1) ·
945255 (1) ·
945258 (1) ·
945259 (1) ·
945260 (1) ·
945262 (1) ·
945263 (1) ·
945266 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.15 mi East of Bay Drive' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5Mi S of COVE RD ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.9MI S OF PAAR DRIVE ' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'200ft. W of A1A ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Between SR-A1A & SR-5 ' (1)
26211596 (1) ·
26211635 (1) ·
26235789 (1) ·
26274181 (1) ·
26302557 (1) ·
26344631 (1) ·
26382089 (1) ·
26383900 (1) ·
26405332 (1) ·
26414262 (1) ·
26423785 (1) ·
27081140 (1) ·
27121953 (1) ·
27122261 (1) ·
27125212 (1) ·
27130163 (1) ·
27130199 (1) ·
27130777 (1) ·
27132776 (1) ·
27132857 (1) ·
27165946 (1) ·
27233900 (1) ·
29013457 (1)
80022643 (1) ·
80030866 (1) ·
80035127 (1) ·
80040020 (1) ·
80044341 (1) ·
80052320 (1) ·
80074249 (1) ·
80105691 (1) ·
80121056 (1) ·
80123486 (1) ·
80134460 (1) ·
80205419 (1) ·
80212173 (1) ·
80214187 (1) ·
80221889 (1) ·
80224460 (1) ·
80230070 (1) ·
80240091 (1) ·
80240291 (1) ·
80252443 (1) ·
80273077 (1) ·
80572813 (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)