Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'Canal ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'Deep Creek ' (1) ·
'E-1-E CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Palmetto Park Road ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-513 ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'Atlantic Avenue ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'IBIS WAY ' (1) ·
'Malabar Rd ' (1) ·
'MERCER AVE ' (1) ·
'PONCE DE LEON ST ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'SANDALFOOT BLVD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-407 ' (1) ·
'SW 18th Street ' (1) ·
'SW THIRD ST ' (1) ·
'US-17 ' (1) ·
'VIA DELRAY BLVD ' (1) ·
'W. CAMINO REAL ' (1)
700083 (1) ·
700091 (1) ·
700149 (1) ·
704004 (1) ·
705953 (1) ·
790002 (1) ·
885603 (1) ·
930064 (1) ·
930184 (1) ·
930187 (1) ·
930188 (1) ·
930197 (1) ·
930198 (1) ·
934278 (1) ·
934326 (1) ·
934402 (1) ·
934403 (1) ·
934406 (1) ·
934427 (1) ·
936801 (1) ·
937350 (1) ·
937351 (1) ·
937352 (1) ·
937355 (1) ·
937708 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.25 mi. N of County Line' (1) ·
'0.3MI E OF SR-7 US-441 ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.5MI W OF MILITARY TRAIL' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'At SR-7/US-441 ' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Boca Raton ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'US-17 over Deep Creek ' (1)
26195500 (1) ·
26200974 (1) ·
26203879 (1) ·
26203900 (1) ·
26204432 (1) ·
26210275 (1) ·
26252840 (1) ·
26274181 (1) ·
26283319 (1) ·
26381235 (1) ·
26382089 (1) ·
26412955 (1) ·
26412989 (1) ·
26415540 (1) ·
26423137 (1) ·
26423784 (1) ·
26445565 (1) ·
27464133 (1) ·
27595640 (1) ·
27595668 (1) ·
28124563 (1) ·
28124610 (1) ·
28300578 (1) ·
29094796 (1)
80022643 (1) ·
80035127 (1) ·
80041431 (1) ·
80041713 (1) ·
80052490 (1) ·
80070200 (1) ·
80070450 (1) ·
80070500 (1) ·
80070535 (1) ·
80074489 (1) ·
80074527 (1) ·
80075055 (1) ·
80115311 (1) ·
80121006 (1) ·
80131606 (1) ·
80134407 (1) ·
80134651 (1) ·
80134748 (1) ·
80284214 (1) ·
80362348 (1) ·
80362349 (1) ·
80401800 (1) ·
80424614 (1) ·
80501889 (1) ·
81232561 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.