Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL ' (1) ·
'E-3 Canal ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'KELLER CANAL E-4 ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'10TH AVE. NORTH ' (1) ·
'45TH STREET ' (1) ·
'Atlantic Avenue ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 704 ' (1) ·
'IBIS WAY ' (1) ·
'MERCER AVE ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'SAM SENTER RD ' (1) ·
'SE 7TH STREET ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SW 22ND WAY ' (1) ·
'W/B S.R. 704 ' (1) ·
'West Atlantic Ave.' (1)
930064 (1) ·
930069 (1) ·
930106 (1) ·
930107 (1) ·
930183 (1) ·
930210 (1) ·
930240 (1) ·
934100 (1) ·
934464 (1) ·
934465 (1) ·
934513 (1) ·
935100 (1) ·
935306 (1) ·
935900 (1) ·
936801 (1) ·
937708 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'200ft. W of A1A ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'Just W. of Congress Ave.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.