Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'C-52 Canal ' (1) ·
'CANAL ' (1) ·
'DITCH NO. 34 ' (1) ·
'DITCH NO. 46 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'I-4 ' (1) ·
'L-78 Borrow Canal ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'Padgett Branch Marsh ' (1) ·
'SOUTH RELIEF CANAL ' (1) ·
'St. Johns Marsh ' (1) ·
'St. Sebastian River ' (1)
790210 (1) ·
880006 (1) ·
880041 (1) ·
880042 (1) ·
880045 (1) ·
880047 (1) ·
880090 (1) ·
880094 (1) ·
880096 (1) ·
880098 (1) ·
884078 (1) ·
884079 (1) ·
930460 (1) ·
941001 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.6MI N OF CR-606 ' (1) ·
'1 MI N OF SR-60 ' (1) ·
'10.3Mi. E of SR-91 (TPK) ' (1) ·
'11.6Mi. E of SR-91 (TPK) ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'2Mi West of CR-512 ' (1) ·
'3.7 MILES NORTH OF SR-60 ' (1) ·
'3MI W OF CR-615 ' (1) ·
'6.4Mi. E of SR-91 (TPK) ' (1) ·
'Cassadaga Road over I-4 ' (1) ·
'SR-80 & Military Trail ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.