Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 Canal ' (1) ·
'CANAL C-108 ' (1) ·
'CANAL C-73 ' (1) ·
'CANAL E-105 ' (1) ·
'CANAL E-106 ' (1) ·
'CANAL E-114 ' (1) ·
'CANAL E-12/E-84 ' (1) ·
'CANAL E-14 ' (1) ·
'CANAL E-8 ' (1) ·
'CANAL E-84 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Tide Relief' (1) ·
'LWDD CANAL E-1 ' (1) ·
'MANATEE CREEK ' (1) ·
'RELIEF CANAL ' (1) ·
'Ten Mile Creek ' (1) ·
'TRIBUTARY OF MANATEE CRK' (1)
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'COLUMBUS DR. ' (1) ·
'CR-722 (COVE RD) ' (1) ·
'CR-A1A (DIXIE HWY)' (1) ·
'DARWIN BLVD ' (1) ·
'GETTYSBURG DR ' (1) ·
'GRANDVIEW WAY ' (1) ·
'JEANNE AVE ' (1) ·
'KESTOR DR ' (1) ·
'MURPHY RD ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'PAAR DR ' (1) ·
'PAAR DR. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'Southern Boulevard' (1) ·
'SR80(SouthernBlvd)' (1) ·
'UNDALLO RD ' (1) ·
'WB SR-70 ' (1)
890011 (1) ·
890012 (1) ·
890044 (1) ·
890111 (1) ·
894003 (1) ·
930097 (1) ·
930098 (1) ·
934920 (1) ·
934921 (1) ·
937362 (1) ·
937366 (1) ·
940120 (1) ·
945255 (1) ·
945257 (1) ·
945258 (1) ·
945259 (1) ·
945260 (1) ·
945261 (1) ·
945262 (1) ·
945263 (1) ·
945264 (1) ·
945265 (1) ·
945266 (1) ·
945267 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.1 Mile East of A1A ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.25mi W of S.R.-A1A ' (1) ·
'0.2Mi S of COVE RD ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5Mi E of A1A ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'0.9MI S OF PAAR DRIVE ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.2MI W OF PORT ST. LUCIE' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1)
26211596 (1) ·
26211635 (1) ·
26403161 (1) ·
26403240 (1) ·
26414262 (1) ·
26423785 (1) ·
27081946 (1) ·
27082843 (1) ·
27083585 (1) ·
27120310 (1) ·
27121953 (1) ·
27124842 (1) ·
27125212 (1) ·
27125867 (1) ·
27130073 (1) ·
27130163 (1) ·
27130199 (1) ·
27130362 (1) ·
27130777 (1) ·
27131422 (1) ·
27132776 (1) ·
27132857 (1) ·
27165946 (1) ·
27233900 (1)
80022719 (1) ·
80025423 (1) ·
80105883 (1) ·
80111608 (1) ·
80111763 (1) ·
80121056 (1) ·
80123486 (1) ·
80134460 (1) ·
80174285 (1) ·
80205419 (1) ·
80205945 (1) ·
80212173 (1) ·
80213453 (1) ·
80214187 (1) ·
80214259 (1) ·
80220192 (1) ·
80221889 (1) ·
80224460 (1) ·
80230070 (1) ·
80232953 (1) ·
80240091 (1) ·
80252443 (1) ·
80273077 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)