Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-23 CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CR 709 & FECRR ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Gatlin Blvd ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'MAPLE CREEK ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SR-507 ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1)
700186 (1) ·
705603 (1) ·
894003 (1) ·
894019 (1) ·
894033 (1) ·
934491 (1) ·
934505 (1) ·
940108 (1) ·
940109 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1) ·
940126 (1) ·
940127 (1) ·
945251 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1.9MI S of CR-714 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'SR-507 over Crane Creek ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)