Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRITT CANAL ' (1) ·
'C-1 Canal ' (1) ·
'C-59 Canal ' (1) ·
'Cambridge Canal ' (1) ·
'Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lateral A Canal ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'Okeechobee Waterway ' (1) ·
'Pluckebaum Canal ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'Underhill Slough ' (1) ·
'US 92 ' (1) ·
Addison Canal (1)
'33rd Street ' (1) ·
'BRITT RD ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'I-4 Ramp B ' (1) ·
'Lake Harney Road ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'Pace Drive ' (1) ·
'Palm Bay Parkway ' (1) ·
'Range Rd ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-5A ' (1) ·
'SR-710 EB ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'Trailwood Drive ' (1) ·
I-95 (1)
700229 (1) ·
704194 (1) ·
705924 (1) ·
705925 (1) ·
790136 (1) ·
790248 (1) ·
794050 (1) ·
796414 (1) ·
880062 (1) ·
884100 (1) ·
884104 (1) ·
890161 (1) ·
894000 (1) ·
894062 (1) ·
931013 (1) ·
934369 (1) ·
940009 (1) ·
940162 (1) ·
940163 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25Mi S/O Wiltshire Blvd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.75 Mi. South of SR-520 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1Mi W of US-1 ' (1) ·
'2 Mi West of Jupiter Blvd' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'I-4 Connector over US-92 ' (1) ·
'Palm Beach Garden Interch' (1) ·
I-95 over Addison Canal (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.