Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'Canal ' (1) ·
'CSX Railroad ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'Eau-Gallie River ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'I-4 ' (1) ·
'I-95 (SR-9) ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'M CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
'Tomoka River ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARINA BLVD. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Peninsula Corp Dr ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR-518 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-92 ' (1) ·
'US-92 WB ' (1) ·
SR-520 (1)
700191 (1) ·
700196 (1) ·
790021 (1) ·
790114 (1) ·
790166 (1) ·
930442 (1) ·
930443 (1) ·
930444 (1) ·
930445 (1) ·
930447 (1) ·
934151 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934488 (1) ·
934518 (1) ·
934943 (1) ·
934944 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
'US-92 WB-Tomoka River ' (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)