Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'CANAL C-24 ' (1) ·
'CSX Railroad ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'Eau-Gallie River ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I-4 ' (1) ·
'I-95 (SR-9) ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'Long Creek ' (1) ·
'M CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MONTERREY WATERWAY ' (1) ·
'N Fork St. Lucie River ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1) ·
Indian River Relief East (1)
'BOB W RD 130TH ST.' (1) ·
'BROWNS FARM/CR-827' (1) ·
'E. CAMINO REAL ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MARINA BLVD. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NW 27TH AVE. ' (1) ·
'Peninsula Corp Dr ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to Cong Av' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR-518 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'US-98 (SR-80) ' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB St. Lucie Blvd.' (1) ·
SR-520 (1)
700191 (1) ·
700196 (1) ·
790166 (1) ·
885810 (1) ·
930053 (1) ·
930442 (1) ·
930443 (1) ·
930444 (1) ·
930445 (1) ·
930447 (1) ·
934151 (1) ·
934271 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934408 (1) ·
934488 (1) ·
934518 (1) ·
934943 (1) ·
934944 (1) ·
940143 (1) ·
940144 (1) ·
940145 (1) ·
945272 (1) ·
945273 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.4Mi. North of SR-60 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'4.6MI W OF US-1 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'5.7MI W OF US-1 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT SR-7 (Range Line Rd) ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
SR-520 - Indian River Relief (1)
26195136 (1) ·
26202200 (1) ·
26251431 (1) ·
26251444 (1) ·
26252840 (1) ·
26290151 (1) ·
26320076 (1) ·
26360954 (1) ·
26401030 (1) ·
26401260 (1) ·
26401280 (1) ·
26403272 (1) ·
26404140 (1) ·
26455392 (1) ·
27155561 (1) ·
27161503 (1) ·
27161886 (1) ·
27161895 (1) ·
27283673 (1) ·
27384120 (1) ·
28074371 (1) ·
28212382 (1) ·
28544052 (1)
80033598 (1) ·
80043770 (1) ·
80052320 (1) ·
80052546 (1) ·
80052570 (1) ·
80052717 (1) ·
80084210 (1) ·
80084271 (1) ·
80084275 (1) ·
80084953 (1) ·
80102169 (1) ·
80115706 (1) ·
80120923 (1) ·
80121591 (1) ·
80182538 (1) ·
80191739 (1) ·
80192691 (1) ·
80214773 (1) ·
80221826 (1) ·
80235569 (1) ·
80244948 (1) ·
80293882 (1) ·
80390094 (1) ·
80423456 (1) ·
81161842 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)