Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF MIAMI CANAL ' (1) ·
'CANAL C-108 ' (1) ·
'Creek ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'DRAINAGE CANAL ' (1) ·
'Drainage Ditch ' (1) ·
'E-3 CANAL ' (1) ·
'Indian River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'KRUEGER CREEK ' (1) ·
'Lake Ashby Canal ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'Misner Branch ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'Tillman Canal ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'CR-717 ' (1) ·
'CR-880 ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'EB Lake Worth Rd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'JORGENSEN RD ' (1) ·
'Main Trail ' (1) ·
'Maytown Road ' (1) ·
'MIAMI CANAL ROAD ' (1) ·
'Minton Road CR-509' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'PALMETTO PK RD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SELVITZ RD. ' (1) ·
'SPANISH ISLES BLVD' (1) ·
'SR-40 ' (1) ·
'SR-656 (17th St.) ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'US-192 EB ' (1) ·
'Willowood Drive ' (1)
700181 (1) ·
704032 (1) ·
704075 (1) ·
790048 (1) ·
790049 (1) ·
794139 (1) ·
794141 (1) ·
796000 (1) ·
880077 (1) ·
890101 (1) ·
890107 (1) ·
890120 (1) ·
930072 (1) ·
930329 (1) ·
930351 (1) ·
930373 (1) ·
934516 (1) ·
934902 (1) ·
934905 (1) ·
934940 (1) ·
945252 (1) ·
945253 (1) ·
945254 (1)
'.21 E of Minton Rd. ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.2MI N OF NW BAYSHORE BL' (1) ·
'0.2MI S OF N MACEDO BLVD.' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.2 Mi. W of Barberville ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2.2MI S OF SR-80 ' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2MI E of SR-76 ' (1) ·
'3.2 MI W Of Barberville ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'4.8 miles East of SR-415 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'US-192 EB - Indian River ' (1)
26210226 (1) ·
26240578 (1) ·
26295449 (1) ·
26370804 (1) ·
26383999 (1) ·
26400360 (1) ·
26404182 (1) ·
26421986 (1) ·
27035280 (1) ·
27084791 (1) ·
27115100 (1) ·
27201582 (1) ·
27201586 (1) ·
27201587 (1) ·
27375640 (1) ·
28004932 (1) ·
28030000 (1) ·
28050237 (1) ·
28504614 (1) ·
28504680 (1) ·
29101536 (1) ·
29104339 (1) ·
29165358 (1)
80032221 (1) ·
80072029 (1) ·
80074511 (1) ·
80074852 (1) ·
80075212 (1) ·
80112778 (1) ·
80120021 (1) ·
80135670 (1) ·
80213056 (1) ·
80215969 (1) ·
80221680 (1) ·
80222500 (1) ·
80270492 (1) ·
80352939 (1) ·
80400400 (1) ·
80401977 (1) ·
80424695 (1) ·
80491520 (1) ·
81044532 (1) ·
81054109 (1) ·
81060638 (1) ·
81261295 (1) ·
81280837 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)