Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-108 ' (1) ·
'CANAL C-73 ' (1) ·
'CANAL E-105 ' (1) ·
'CANAL E-106 ' (1) ·
'CANAL E-114 ' (1) ·
'CANAL E-12/E-84 ' (1) ·
'CANAL E-14 ' (1) ·
'CANAL E-8 ' (1) ·
'CANAL E-84 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'RELIEF CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Turnbull Creek ' (1)
'Banana River Drive' (1) ·
'COLUMBUS DR. ' (1) ·
'DARWIN BLVD ' (1) ·
'GETTYSBURG DR ' (1) ·
'GRANDVIEW WAY ' (1) ·
'JEANNE AVE ' (1) ·
'KESTOR DR ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'PAAR DR ' (1) ·
'PAAR DR. ' (1) ·
'Park Road ' (1) ·
'Pioneer Trail ' (1) ·
'Pioneer Trail ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'UNDALLO RD ' (1) ·
'WALLIS ROAD ' (1)
704063 (1) ·
794117 (1) ·
794118 (1) ·
930367 (1) ·
930801 (1) ·
934223 (1) ·
937366 (1) ·
945255 (1) ·
945257 (1) ·
945258 (1) ·
945259 (1) ·
945260 (1) ·
945261 (1) ·
945262 (1) ·
945263 (1) ·
945264 (1) ·
945265 (1) ·
945266 (1) ·
945267 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.15 mi East of Bay Drive' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI W of N QUICK CIRCLE' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.3MI E OF DARWIN BLVD ' (1) ·
'0.3MI W of DARWIN BLVD. ' (1) ·
'0.4MI S OF PAAR DRIVE ' (1) ·
'0.4MI W OF PORT ST LUCIE ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5Mi S of PAAR DRIVE ' (1) ·
'0.7MI S OF PAAR DRIVE ' (1) ·
'0.7MI Wof SW DARWIN BLVD.' (1) ·
'0.8MI N OF SW BECKER RD ' (1) ·
'0.9MI S OF PAAR DRIVE ' (1) ·
'1.2MI W OF PORT ST. LUCIE' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)