Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B-19 Canal / Trib 1 ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Deep Creek ' (1) ·
'EL RIO CANAL ' (1) ·
'EPB CANAL C-3 ' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Lateral C Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'Rio Mar Bay ' (1) ·
'South Relief Canal ' (1) ·
'Spruce Creek ' (1)
'5th Street SW ' (1) ·
'Bay Drive ' (1) ·
'CR-3 ' (1) ·
'CR-4009 ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR605 Old Dixie ' (1) ·
'Esplanade Avenue ' (1) ·
'Island Drive ' (1) ·
'JUPITER BEACH RD ' (1) ·
'Jupiter Boulevard ' (1) ·
'LE CHALET BLVD ' (1) ·
'LINTON BLVD. ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PROSPERITY FARMSRD' (1) ·
'River Drive ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR-406 ' (1) ·
'SW 18TH ST ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1)
700227 (1) ·
705923 (1) ·
794081 (1) ·
794193 (1) ·
796413 (1) ·
880089 (1) ·
884085 (1) ·
884086 (1) ·
885811 (1) ·
885812 (1) ·
930322 (1) ·
934125 (1) ·
934135 (1) ·
934487 (1) ·
935218 (1) ·
936656 (1) ·
936776 (1) ·
940035 (1) ·
940111 (1) ·
940112 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.1 Mile West of A1A ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'100Ft. South of Bay Drive' (1) ·
'1MI W of US-1 ' (1) ·
'2.3 Miles South of SR-40 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'5th St. SW at CR-611 ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'I-95 over Midway Road ' (1) ·
'SR-406 over Indian River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)