Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'CANAL ' (1) ·
'Danforth Creek ' (1) ·
'Deep Creek ' (1) ·
'E-1 Canal ' (1) ·
'Halifax River IWW ' (1) ·
'Lake Ashby Canal ' (1) ·
'LIPTOG CANAL ' (1) ·
'NORTH RELIEF CANAL ' (1) ·
'Reed Canal ' (1) ·
'SR-76 & St. Lucie Canal ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'Underhill Slough ' (1) ·
'WPB WATER SUPPLY CANAL ' (1)
'Berry Avenue ' (1) ·
'CR-3 ' (1) ·
'CR5A OLD DIXIE HWY' (1) ·
'Lake Ashby Road ' (1) ·
'Lake Harney Road ' (1) ·
'MURPHY RD ' (1) ·
'PINE RIDGE WAY ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SR-40 ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-5A ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'US-441 SR-15 ' (1) ·
'VILLAGE BLVD ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'WB SR - 714 ' (1)
790132 (1) ·
790136 (1) ·
794050 (1) ·
794081 (1) ·
794146 (1) ·
796500 (1) ·
880062 (1) ·
890103 (1) ·
890112 (1) ·
890135 (1) ·
894054 (1) ·
930401 (1) ·
937361 (1) ·
937363 (1) ·
937710 (1) ·
937711 (1) ·
937712 (1) ·
937714 (1) ·
940009 (1)
'0.1 Mile S of CR-714 ' (1) ·
'0.4MI NW OF HIGH MEADOW ' (1) ·
'0.8MI S OF 45TH ST CR702 ' (1) ·
'0.9MI N OF CR-630 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'2.3 Miles South of SR-40 ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'200ft. East of SR-415 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'50FT W OF VILLAGE BLVD ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'US-441 and SR-76 ' (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)