Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Bloom Free But Barren (1) ·
DeSantis’ support is vital in Indian River Lagoon restoration effort (1) ·
EPA Announces $97,527,000 for Infrastructure Projects to Protect Surface Water and Drinking Water in Florida (1) ·
Rep. Brian Mast speaks about Lake Okeechobee water releases and management (1) ·
Sebastian Inlet Bridge Set for 2026 Replacement (1)
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
Funding is available for a wide range of water infrastructure projects, including modernizing aging wastewater infrastructure, implementing water reuse and recycling and addressing stormwater. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1) ·
U.S. Rep. Brian Mast spoke about Lake Okeechobee water levels on Tuesday morning, and called on the U.S. Army Corps of Engineers to change its water management, or he says we could see harmful water releases this summer. (1) ·
Without immediate drastic environmental changes from the city to federal level Brevard County residents may soon witness the death of the Northern Indian and Banana River lagoons. (1)
Showing below up to 5 results in range #1 to #5.