Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > Title :
NASA Causeway Bridges and Beyond or
NASA Report Considers How It Can Help Indian River Lagoon or
SR405 NASA Causeway to be replaced by 2025
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
NASA passes ownership of the SR405 Indian River Causeway to the Florida Department of Transportation along with a decades old categorical exclusion that exempts the bridge replacement from environmental review. (1) ·
Problems with the Indian River Lagoon have caused a race to save the unique estuary, and now Kennedy Space Center is considering its part in the lagoon's health as well. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)