Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > Title :
Merritt Island National Wildlife Refuge Update or
NASA Conducts Environmental Assessment, Practices Responsible Growth or
SR405 NASA Causeway to be replaced by 2025
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In response to an inquiry from SpaceX, NASA is preparing to conduct environmental assessments to develop a proposed new launch site, Launch Complex 49, at the agency’s Kennedy Space Center in Florida. (1) ·
Merritt Island National Wildlife Refuge has closed Biolab Road. Blackpoint Wildlife Drive and other refuge areas are open. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)