Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > Title :
Kennedy Space Center to Launch Indian River Lagoon Restoration Plan or
NASA Causeway Bridges and Beyond or
SR405 NASA Causeway to be replaced by 2025
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
Kennedy Space Center Director Janet Petro reveals plans for an upcoming Indian River Lagoon health initiative at KSC. (1) ·
NASA passes ownership of the SR405 Indian River Causeway to the Florida Department of Transportation along with a decades old categorical exclusion that exempts the bridge replacement from environmental review. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)