Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > Title :
$1.7m Peroxide Algal Bloom Treatment Underway at Lake Minneola or
Lagoon Faces Weather Conditions That Could Lead to Potential Fish Kills or
SR405 NASA Causeway to be replaced by 2025
Use the filters below to narrow your results.
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
Israeli company BlueWater Technologies completed it's $940,000 Lake O. contract last week with no application of their hydrogen peroxide algicide. This week they move to Lake Minneola to begin a $1.7m contract to apply the controversial product. (1) ·
There currently are several types of algae blooming in the lagoon, which is evident in areas of the lagoon that have turned the color of pea soup. (1)
Showing below up to 3 results in range #1 to #3.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)