Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
News Link > SubTitle :
Brevard Abandon Boat Removal Program or
Facility to use water lettuce to absorb and remove dissolved nutrients from the North Relief Canal. or
Sebastian Inlet bridge set to be replaced in 2026
Use the filters below to narrow your results.
Brevard County Boating and Waterways begins removing 40 - 50 derelict boats from the Indian River Lagoon. (1) ·
Indian River County has received a $650,000 grant from the Florida DEP for construction of an Aquatic Plant System to remove nutrients from farm waters before discharge into the Indian River Lagoon. (1) ·
The 57-year-old bridge spanning the Sebastian Inlet to link the Brevard and Indian River barrier islands is set to be replaced in late 2026, according to the Florida Department of Transportation. (1)
Showing below up to 3 results in range #1 to #3.