Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
Space Exploration Technologies (SpaceX) submitted a proposal to expand its Starship/Super Heavy program operations at the Kennedy Space Center (KSC). (1) ·
The St. Johns River Water Management District Governing Board approved a $19.5 million contract to begin construction of the Crane Creek M-1 Canal Flow Restoration Project. (1) ·
Without immediate drastic environmental changes from the city to federal level Brevard County residents may soon witness the death of the Northern Indian and Banana River lagoons. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)