Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
A new inlet will not save the lagoon (1) ·
EPA Announces $97,527,000 for Infrastructure Projects to Protect Surface Water and Drinking Water in Florida (1) ·
Indian River County to build nutrient removal facility to protect lagoon (1) ·
Indian River Lagoon Repository (1) ·
It’s bat time again: Check your home before maternity season (1)
Funding is available for a wide range of water infrastructure projects, including modernizing aging wastewater infrastructure, implementing water reuse and recycling and addressing stormwater. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
Indian River County has received a $650,000 grant from the Florida DEP for construction of an Aquatic Plant System to remove nutrients from farm waters before discharge into the Indian River Lagoon. (1) ·
Indian River Lagoon Project has added an IRL Document Repository to archive Indian River Lagoon documents for safekeeping and easy retrieval. (1) ·
Removal of Florida bat colonies must be completed before the maternity season starts on April 15. Bat exclusions are illegal during the maternity season, which runs through August 15. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)