Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
Cape Canaveral Provides Lagoon Friendly Sustainability Model (1) ·
DeSantis’ support is vital in Indian River Lagoon restoration effort (1) ·
IRL Roundtable Receives KSC Indian River Lagoon Health Initiative Plan Initial Release (1) ·
SJRWMD Amends Crane Creek M-1 Canal Restoration Project (1) ·
SR405 NASA Causeway to be replaced by 2025 (1)
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In an effort to protect residents from increasing environmental challenges and in keeping with it's Vision Statement, the City of Cape Canaveral has implemented numerous lagoon friendly sustainability initiatives. (1) ·
On November 9, 2021 the St. Johns River Water Management District Governing Board voted to amend Melbourne's Crane Creek M-1 Canal Restoration Project in order to add additional funding and to extend the expiration date. (1) ·
The KSC IRL Health Initiative provides a plan which considers the unique relationship between the Kennedy Space Center and the Indian River Lagoon National Estuary. (1)
Showing below up to 5 results in range #1 to #5.