Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
A new inlet will not save the lagoon (1) ·
DeSantis’ support is vital in Indian River Lagoon restoration effort (1) ·
Indian River lagoon is pea-soup green, raising fears of another 'bloom of doom' (1) ·
Rep. Brian Mast speaks about Lake Okeechobee water releases and management (1) ·
SR405 NASA Causeway to be replaced by 2025 (1)
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1) ·
U.S. Rep. Brian Mast spoke about Lake Okeechobee water levels on Tuesday morning, and called on the U.S. Army Corps of Engineers to change its water management, or he says we could see harmful water releases this summer. (1)
Showing below up to 5 results in range #1 to #5.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)