Drilldown: News Link
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
A new inlet will not save the lagoon (1) ·
Avian Influenza Confirmed in Florida (1) ·
DeSantis’ support is vital in Indian River Lagoon restoration effort (1) ·
FWC Continues to Monitor Avian Influenza Across Florida (1) ·
Indian River lagoon is pea-soup green, raising fears of another 'bloom of doom' (1) ·
SR405 NASA Causeway to be replaced by 2025 (1)
Dr. Peter Barile, "The Legislature and the governor should be vigilant in cutting wasteful spending projects such as muck dredging and “super clam” seed plantings that are not consistent with the FDEP’s restoration plans for the Lagoon." (1) ·
Florida DOT officials expect the SR405 bridge construction to begin in 2021, with estimated completion in 2025. The new fixed-span bridges will rise at least 65 feet above the river's surface. (1) ·
Florida Fish and Wildlife Conservation Commission has been notified by the National Veterinary Services Laboratory of confirmed cases of Highly Pathogenic Avian Influenza (HPAI) strain: H5 2.3.4.4 in avian species. (1) ·
In this Florida Today editorial, geologist Randall Parkinson speaks against new Indian River Lagoon inlets. (1) ·
The Florida Fish and Wildlife Conservation Commission (FWC) continues to monitor bird mortalities suspected to be attributed to Highly Pathogenic Avian Influenza throughout Florida. (1) ·
Tiny single-celled algae have begun to cast a huge pea-soup green shadow over the Indian River Lagoon, setting the stage for a repeat of the massive fish kill four years ago, when dead sea life fouled canals and choked the lagoon during a smelly summer of environmental chaos. (1)
Showing below up to 6 results in range #1 to #6.